10.01.19 Lake Shore Drive/Cline Update

10.01.19 – Lake Shore Drive/Cline Roundabout Update: 
Construction work continues. Curb work is continuing.  Tasks are on schedule. 
 
Reminder – Vermillion and Cline are through streets and are not 4-way stops.  Use caution in the construction area and observe posted signage.
 
Thank you for your patience.